|
|
|
|
|
Reconstructions |
|
|
Reconstruction of the pedestrian
bridge over the M7 Motorway at Érd, Tetőfedő Street |
|
 |
| Loading class: |
5,0 kN/m2 |
| Span: |
34,00 + 34,00 m |
| Traffic lanes: |
3,15 m footway |
| Length of the bridge: |
69,00 m |
| Width of the bridge: |
3,50 m |
| Structural depth: |
1,41 m |
| Prestressing: |
2-2 pcs. of VT-CMM 04-150 tendons / side |
|
The Tetőfedő Street pedestrian
bridge over M7 Motorway at Érd was
reconstructed in 2002. The 35 years old two span
continuous R.C. box beam bridge showed big
deflections and a lot of cracks. Beyond the
full-scale reconstruction of the bridge, external
prestressing was used in order to reduce the above
faults and to improve the long term serviceability
of the bridge. |
|
|